Skip to main content

HBS Group Southern delivered an integrated M&E and renewable solution for First Wessex’s affordable housing project at Bellevue Road, Southampton. We installed solar panels to the new build accommodation, ensuring it met Code for Sustainable Home Level 4.

First Wessex Homes are a specialist construction company who build and renovate social housing across the South. In 2013, they started the redevelopment of the Bellevue Road site in partnership with Southampton City Council, offering 19 new build flats for young families. HBS Group Southern provided a full service solar PV solution as part of an integrated electrical, mechanical and renewable package.

Project delivery

  • HBS New Energies completed the design, supply, installation, commissioning and O&M of the development’s rooftop solar PV system.
  • A thorough site survey was completed in conjunction with the architects and SAP assessor to identify and design the most cost-effective solar PV system that would best suit the building.
  • We managed the PV installation from start to finish including; roofing, installation, electrical connection and system commissioning.
  • The new energies division worked closely with the electrical and mechanical divisions to deliver a fully-integrated solution, ensuring the client’s project targets were met phase by phase without any issues.
  • At completion we briefed First Wessex on the PV system installed and provided a detailed handover pack, that included the necessary warranty documents and O&M instructions.
  • The solar PV system will provide reliable, low-cost electricity for the social tenants. First Wessex will also earn additional income through the Feed-in Tariff payments for the clean electricity generated by the new build development’s 12 kWp PV system.
  • Installing solar PV enabled the scheme to meet its renewable energy obligations and achieve a Code for Sustainable Homes Level 4. All apartments have been built to the highest standards of sustainability, making them environmentally friendly, cost effective to maintain and cheaper for social tenants to run.

Project summary

   No. of plots 19    
    Modules  Mitsubishi 225W Poly   
    System size  12 kWp    
    Total annual output 66.25 kWh    
    Inverter  SMA 1200    
  Annual CO2 savings  26,500 kg  
HBS new energies new build solar PV solar for public sector case studies first wessex bellevue solar for social housing
HBS New Energies solar for public sector First Wessex Bellevue case study mechanical and electrical services
HBS New Energies solar for public sector First Wessex Bellevue case study 2

Contact us with your project requirements and discover how your project could benefit from our new build solar PV services.